Highway Closure Process
To apply for a road closure please see the Highway Closure Application Form to the right of this page. This form should be completed by anyone who would like to apply for permission to close the highway. You must allow at least 2 weeks if you are planning on a partial closure and 12 weeks if you are planning on a full road closure, (closure of the entire width of the road,) as a temporary traffic prohibition/restriction order will be required. Please return your completed form to environment@scilly.gov.uk or drop into the Library on St Marys. Please retain a copy for your records.
Please note the Council of the Isles of Scilly is not responsible for private roads. A highway closure form needs only to be filled when it affects a publicly maintained road.
The list below reflects the current highway closure applications with the most recent and ‘live’ applications appearing at the top.
If you would like to comment or request more information on any of our applications please contact us at environment@scilly.gov.uk or give us a call on 01720 424450
Application Number |
Location/ Road(s) Affected |
Detail |
Start Date and Time |
Finish Date and Time |
Decision |
|
HWA-24-04 | Footway behind Treboeth Guesthouse, Hugh Town, St Mary's | Emergency Breaking Open the Highway |
10:30 05/08/2024 |
15:00 05/08/2024 |
APPROVED | |
HWA-24-03 | Mermaid Car Park, St Mary's | Container on the Highway |
20:00
13/08/2024 |
17:00
19/08/2024 |
APPROVED | |
HWA-24-01 | Silver St car park, The Parade, Silver Street. | Full Road Closure, Partial Road Closure | 8:00 31/05/2024 |
18:00 30/06/2026 |
APPROVED | |
HWA-23-015 (4) | Carn Friars Lane, St Mary's | Partial Road Closure |
08:00 30/09/2023 |
19:00 30/09/2023 |
APPROVED | |
HWA-23-015 (3) | Telegraph Road, Sunnyside to Rose Cottage | Partial Road Closure |
08:00 23/09/2023 |
19:00 23/09/2023 |
APPROVED | |
HWA-23-022 | Outside Chemist, St Mary's | Breaking Open the Highway |
13:00 21/09/2023 |
17:00 22/09/2023 |
APPROVED | |
HWA-23-021 | Well Lane, St Mary's | Emergency Breaking Open the Highway and Full Road Closure |
09:00 16/09/2023 |
16:00 18/09/2023 |
APPROVED | |
HWA-23-020 | Park House | Scaffolding on the Highway |
09:00 15/09/2023 |
09:00 11/11/2023 |
APPROVED | |
HWA-23-015 (2) | Parting Carn Junction to Longstone Corner | Partial Road Closure |
08:00 20/08/2023 |
20:00 20/08/2023 |
APPROVED | |
HWA-23-019 | Back Lane Museum | Breaking Open the Highway |
10:00 11/08/2023 |
11:00 11/08/2023 |
APPROVED | |
HWA-23-018 | Old Town, opposite Old Town Inn car park | Partial Road Closure |
08:00 14/08/2023 |
17:00 21/08/2023 |
APPROVED | |
HWA-23-015 (1) | Telegraph to Rose Hill Junction | Full Road Closure |
08:00 06/08/2023 |
20:00 06/08/2023 |
APPROVED | |
HWA-23-014 | 17 Garrison Lane, Hugh Town | Breaking Open the Highway |
09:00 14/08/2023 |
17:00 18/08/2023 |
APPROVED | |
HWA-23-013 | The Bank/Garrison Hill | Breaking Open the Highway |
08:00 09/07/2023 |
16:00 09/07/2023 |
APPROVED | |
HWA-23-011 | 15 The Strand, Hugh Town | Container on the Highway |
14:00 27/06/2023 |
17:00 30/06/2023 |
APPROVED | |
HWA-23-010 | 4 Well Cross, Hugh Town | Container on the Highway |
14:00 09/06/2023 |
17:00 30/06/2023 |
APPROVED | |
HWA-23-009 | Well Lane, Hugh Town | Breaking Open the Highway |
09:00 24/05/2023 |
17:00 31/05/2023 |
APPROVED | |
HWA-23-008 | An Oberva, Buzza Street | Emergency Break in the Highway |
08:00 20/05/2023 |
16:00 20/05/2023 |
APPROVED | |
HWA-23-007 | Old Town Chapel | Scaffolding on the Highway |
09:00 18/05/2023 |
17:00 31/05/2023 |
APPROVED | |
HWA-23-006 | Back Lane Alley way outside of Wesleyan Chapel | Full Road Closure |
12:00 21/05/2023 |
22:00 22/05/2023 |
APPROVED | |
HWA-23-005 | High Lanes, Sage House | Breaking Open the Highway |
15:00 25/04/2023 |
16:00 08/05/2023 |
APPROVED | |
HWA-23-004 | Old Town Road, outside of Old Town Cafe | Breaking Open the Highway |
08:00 24/04/2023 |
17:00 27/04/2023 |
APPROVED | |
HWA-23-003 | Vine Cottage, St Mary's | Container on the Highway |
09:00 25/04/2023 |
17:00 02/05/2023 |
APPROVED | |
HWA-23-002 | Seagull Cottage, Hugh Town, St. Mary's | Container on the Highway |
09:00 31/03/2023 |
09:00 04/04/2023 |
APPROVED | |
HWA-23-001 | 2 Buzza Street, Hugh Town, St. Mary's | Container on the Highway |
09:00 03/04/2023 |
17:00 03/04/2023 |
APPROVED | |
HWA-22-048 | Old Town Chapel, Old Town, St. Mary's | Scaffolding on the Highway |
09:00 10/03/2023 |
17:00 24/03/2023 |
APPROVED | |
HWA-22-047 | Telegraph Road to Porthmellon Industrial Estate, St. Mary's | Breaking Open the Highway |
08:00 08/03/2023 |
17:00 11/03/2023 |
APPROVED | |
HWA-22-046 | Rosevear, off Hugh Street, St. Mary's | Breaking Open the Highway |
08:00 07/03/2023 |
12:00 08/03/2023 |
APPROVED | |
HWA-22-045 | Ennor Close, Old Town, St. Mary's | Partial Road Closure |
09:00 06/03/2023 |
17:00 17/03/2023 |
APPROVED | |
HWA-22-044 | Tregarthen's Carpark, St. Mary's | Container on the Highway |
08:00 27/02/2023 |
17:00 03/03/2023 |
APPROVED | |
HWA-22-042 | The Strand opposite Vine Cottage | Road Closure & Breaking Open the Highway |
09:00 06/03/2023 |
17:00 09/03/2023 |
APPROVED | |
HWA-22-041 | Jerusalem Terrace Sub Station to Tregarthen's, St. Mary's | Road Closure & Breaking Open the Highway |
09:00 09/03/2023 |
17:00 31/03/2023 |
APPROVED | |
HWA-22-040 | Jerusalem Terrace, St. Mary's | Road Closure & Breaking Open the Highway |
09:00 13/03/2023 |
17:00 16/03/2023 |
APPROVED | |
HWA-22-039 | Old Town Chapel | Scaffolding on the Highway |
09:00 18/02/2023 |
17:00 23/02/2023 |
APPROVED | |
HWA-22-038 | Tregarthen's Car Park, St. Mary's | Container on the Highway |
09:00 15/02/2023 |
17:00 15/02/2023 |
APPROVED | |
HWA-22-037 | Lower Strand, St, Mary's | Full Road Closure |
11:00 07/05/2023 |
19:00 07/05/2023 |
APPROVED | |
HWA-22-036 | Porthloo Lane, St. Mary's, Isles of Scilly | Breaking Open the Highway |
08:00 04/02/2023 |
10:00 04/02/2023 |
APPROVED | |
HWA-22-035 | The Strand, Back Lane, Hugh Town, St. Mary's | Container on the Highway |
08:00 07/02/2023 |
17:00 30/03/2023 |
APPROVED | |
HWA-22-034 | Carn Friars Lane, St. Mary's, Isles of Scilly | Full Road Closure |
08:00 08/02/2023 |
17:00 15/02/2023 |
APPROVED | |
HWA-22-033 | Old Town Road, St. Mary's, Isles of Scilly | Full Road Closure |
08:00 05/02/2023 |
17:00 05/02/2023 |
APPROVED | |
HWA-22-032 | The Junction of Carn Thomas and the Strand to the Park. The Junction of Well Cross and Church Road | Full Road Closure |
12:00 26/04/2023 |
12:00 02/05/2023 |
APPROVED | |
HWA-22-031 | Tregarthen's Car Park | Container on the Highway |
8:00 12/01/2023 |
17:00 03/02/2023 |
APPROVED | |
HWA-22-030 | Old Town Road | Partial Road Closure |
8:00 12/02/2023 |
17:00 26/01/2023 |
APPROVED | |
HWA-22-029 | Mermaid Car Park | Breaking Open the Highway |
12:30 06/12/2022 |
17:00 09/12/2022 |
APPROVED | |
HWA-22-028 | Reculver, The Strand | Container on the Highway |
08:00 09/12/2022 |
18:00 10/12/2022 |
APPROVED | |
HWA-22-027 | 37 Porthcressa Road | Breaking Open the Highway |
9:00 20/12/2022 |
17:00 24/12/2022 |
APPROVED | |
HWA-22-026 | Church Street, outside Bell Rock Hotel | Breaking Open the Highway |
9:00 19/12/2022 |
17:00 22/12/2022 |
APPROVED | |
HWA-22-025 | Church Street, outside Mundesley | Breaking Open the Highway |
9:00 19/12/2022 |
17:00 22/12/2022 |
APPROVED | |
HWA-22-024 | Old Town Chapel | Scaffolding on the Highway |
9:00 28/11/2022 |
17:00 02/12/2022 |
APPROVED | |
HWA-22-023 | The Strand, outside of No.4 | Breaking Open the Highway |
09:00 05/12/2022 |
17:00 08/12/2022 |
APPROVED | |
HWA-22-022 | Church Road, outside of Godolphin Flats | Container on the Highway |
08:00 29/10/2022 |
18:00 03/11/2022 |
APPROVED | |
HWA-22-021 | Hugh Street, The Parade, Garrison Lane, Silver Street and Jerusalem Terrace |
Full Closure of Hugh Street, Silver Street, The Parade (between Bordeaux and The Galley), Garrison Lane (between The Papershop and The Wesleyan Chapel). The suspension of one way traffic along Jerusalem Terrace |
15:30 21/12/2022 |
20:30 21/12/2022 |
APPROVED | |
HWA-22-020 | Telegraph Road,at the Sandy Banks Field, behind Porthmellon Industrial Estate | Partial Highway Closure |
07:30 30/09/2022 |
17:00 14/10/2022 |
APPROVED | |
HWA-22-019 | Church Road, opposite The Chaplaincy | Container on the Highway |
08:00 21/09/2022 |
17:00 26/09/2022 |
APPROVED | |
HWA-22-018 | Porthcressa Rd, outside of Penlee Boathouse | Trailer and bags of aggregate on the highway |
08:00 25/08/2022 |
17:00 02/09/2022 |
APPROVED | |
HWA/22/017 | Public footpath outside The Old Chapel, Old Town | Scaffolding on the Highway |
09:00 29/08/2022 |
17:00 05/09/2022 |
APPROVED | |
HWA-22-016 | Porthcressa Rd, outside of the Public Convenience |
Breaking Open the Highway |
11:00 24/08/2022 |
17:00 31/08/2022 |
APPROVED | |
HWA-22-015 | Sally Port | Full Highway Closure |
08:30 30/08/2022 |
16:00 07/09/2022 |
APPROVED | |
HWA-22-014 | Jerusalem Terrace | Full Closure and Breaking Open the Highway |
13:00 18/08/2022 |
17:00 18/08/2022 |
APPROVED | |
HWA-22-013 | Jerusalem Terrace | Full Closure and Breaking Open the Highway |
13:00 12/08/2022 |
17:00 12/08/2022 |
APPROVED | |
HWA-22-012 | Buzza Road, Porthcressa | Partial Closure and Breaking Open the Highway |
09:00 26/09/2022 |
16:00 30/09/2022 |
APPROVED | |
HWA-22-011 | Carn Gwaval Hill | Partial Closure of the Highway |
08:00 16/08/2022 |
17:00 17/08/2022 |
APPROVED | |
HWA-22-010 | Garrison Lane, outside the Wesleyan Chapel | Ladder on the Highway |
10:30 27/07/2022 |
15:00 27/07/2022 |
APPROVED | |
HWA-22-009 | Church Road, outside Mundesley | Breaking Open the Highway |
08:00 08/08/2022 |
17:00 13/08/2022 |
APPROVED | |
HWA-22-008 | Porthcressa Road | Partial Closure and Breaking Open the Highway |
09:00 11/08/2022 |
16:00 25/08/2022 |
APPROVED | |
HWA-22-007 | Outside old Lloyds Bank buildig, Hugh Street |
Container on Public Highway |
09:00 06/09/2022 |
17:00 17/09/2022 |
APPROVED | |
HWA-22-006 | Rear of Town Hall, Silver Street | Scaffolding on Highway |
10:00 01/07/2022 |
17:00 03/07/2022 |
APPROVED | |
HWA-22-005 | 31-32 Porthcressa Road | Scaffolding on the Highway |
09:00 04/07/2022 |
09:00 01/08/2022 |
APPROVED | |
HWA-22-004 | Back Lane | Container on the Highway |
09:00 17/05/2022 |
16:00 17/05/2022 |
APPROVED | |
HWA-22-003 | Footpath to The Store, Porthmellon Industrial Estate | Partial Closure and Breaking Open the Public HIghway |
09:00 30/05/2022 |
17:00 01/06/2022 |
APPROVED | |
HWA-22-002 | Hugh Street, The Parade, The Strand | Rolling/Moving Highway Closure |
12:30 12/06/2022 |
14:30 12/06/2022 |
APPROVED | |
HWA-22-001 | 1 Ennor Close | Scaffolding on Highway |
09:00 14/04/2022 |
16:00 14/04/2022 |
APPROVED | |
HWA-21-098C | Lower Stand to Telegraph Road | Full Highway Closure |
08:55 05/06/2022 |
09:05 05/06/2022 |
APPROVED | |
HWA-21-098B | The Strand and Telegraph Road | Full Highway Closure |
10:50 04/06/2022 |
11:10 04/06/2022 |
APPROVED | |
HWA-21-098A | The Strand | Full Highway Closure |
08:00 03/06/2022 |
12:00 06/06/2022 |
APPROVED | |
HWA-21-97 | Upper Church Street outside Rosemerryn | Breaking Open the Highway |
09:00 22/03/2022 |
16:00 22/03/2022 |
APPROVED | |
HWA-21-096 | Holy Vale | Partial Road Closure |
08:00 16/03/2022 |
17:00 23/03/2022 |
APPROVED | |
HWA-21-095 | Rams Valley | Breaking Open the Highway |
09:00 17/03/2022 |
16:00 17/03/2022 |
APPROVED | |
HWA-21-094 | Thorofare, outside Golden Bay Mansions | Breaking Open the Highway |
09:00 19/03/2022 |
16:00 19/03/2022 |
APPROVED | |
HWA-21-093 | The Strand, outside Vine Cottage | Scaffolding on the Highway |
09:00 03/03/2022 |
17:00 10/03/2022 |
APPROVED | |
HWA-21-092 | The Strand | Breaking Open the Highway |
08:00 03/03/2022 |
17:00 12/03/2022 |
APPROVED | |
HWA-21-91 | The Bank, outside The Mermaid Inn | Scaffolding on the Highway |
08:00 04/03/2022 |
16:00 04/03/2022 |
APPROVED | |
HWA-21-090 | 6 Silver Street | Scaffolding on the Highway |
09:00 14/03/2022 |
16:00 16/03/2022 |
APPROVED | |
HWA-21-089 | OldTown Road - Nowhere to Old Town Cafe | Full Highway Closure |
16:00 17/02/2022 |
08:00 18/02/2022 |
APPROVED | |
HWA-21-088 | The Strand and Well Cross | Full HIghway Closure |
12:00 27/04/2022 |
12:00 02/05/2022 |
APPROVED | |
HWA-21-087 | Rear of Town Hall, St Marys |
Scaffolding on Highway (Emergency) |
09:00 01/02/2022 |
17:00 04/02/2022 |
APPROVED | |
HWA-21-086 | Church Street, outside of Museum building, opposite Westford House | Skip on the highway |
16:00 26/01/2022 |
17:00 27/01/2022 |
APPROVED | |
HWA-21-085 | Old Town Lane, outside The Old Chapel | Scaffolding on the HIghway |
08:30 17/01/2022 |
17:00 18/01/2022 |
APPROVED | |
HWA-21-084 | The Bank, outside R Douglas Chemist | Emergency Partial Closure and Breaking Open the Highway |
15:00 11/01/2022 |
18:00 11/01/2022 |
APPROVED | |
HWA-21-083 | Partial Closure and Breaking Open the Highway |
08:00 14/02/2022 |
17:00 16/02/2022 |
APPROVED | ||
HWA-21-082 | Partial Closure and Breaking Open the Highway |
08:00 05/02/2022 |
17:00 12/02/2022 |
APPROVED | ||
HWA-21-081 | Branksea Close | Partial Closure and Breaking Open the Highway |
08:00 24/01/2022 |
17:00 28/01/2022 |
APPROVED | |
HWA-21-080 | The Bank, outside Calico Jacks | Skip on the Highway |
08:00 07/01/2022 |
17:00 07/01/2022 |
APPROVED | |
HWA-21-079 | 'Mermaid Car Park' | Closure of three parking spaces |
08:00 05/01/2022 |
17:00 04/02/2022 |
APPROVED | |
HWA-21-078 | McFarlands Down Junction | Works to HIghway Surface (no closure in place) |
08:00 21/12/2021 |
17:00 23/12/2021 |
APPROVED | |
HWA-21-077 | Outisde Rattler, Thorofare | Breaking Open the Highway |
09:00 17/01/2022 |
16:00 17/01/2022 |
APPROVED | |
HWA-21-076 | Outside Nerina, Upper Church Street | Breaking Open the Highway |
09:00 23/02/2022 |
16:00 23/02/2022 |
APPROVED | |
HWA-21-075 | Church Street, Hugh Street, Lower Strand | Moving Full Road Closure |
18:25 27/02/2022 |
19:30 27/02/2022 |
APPROVED | |
HWA-21-074 | Area between Museum Flats and rear of Reculver, The Strand | Skip on the Highway |
09:00 14/12/2021 |
17:00 25/01/2022 |
APPROVED | |
HWA-21-073 | Hugh Street, outside of The Atlantic Inn | Scaffolding on the HIghway |
10:00 30/11/2021 |
TBC | APPROVED | |
HWA-21-072 | Porthloo | Break Open and Partial Closure of the Highway |
09:00 12/11/2021 |
16:00 12/11/2021 |
APPROVED | |
HWA-21-071 | Porthcressa Rd, Outside Lynwood | Break Open the Highway |
09:00 15/11/2021 |
16:00 15/11/2021 |
APPROVED | |
HWA-21-070 | Church Rd, Outsde The Elms | Break Open the Highway |
09:00 14/11/2021 |
16:00 14/11/2021 |
APPROVED | |
HWA-21-069 | Upper Church Street, Outside Nerina | Break Open the Highway |
09:00 14/11/2021 |
16:00 14/11/2021 |
APPROVED | |
HWA-21-068 | Upper Church Street, Outside The Bylet | Break Open the Highway |
09:00 14/11/2021 |
16:00 14/11/2021 |
APPROVED | |
HWA-21-067 | Bay View Terrace | Break Open the Highway |
09:00 13/11/2021 |
16:00 13/11/2021 |
APPROVED | |
HWA-21-066 | Back Lane, Outside Bosuns Locker | Break Open the Highway |
09:00 11/11/2021 |
16:00 11/11/2021 |
APPROVED | |
HWA-21-065 | Thorofare, Outside The Metal Store | Break Open the Highway |
09:00 11/11/2021 |
16:00 11/11/2021 |
APPROVED | |
HWA-21-064 | Little Porth, Outside Storm Cottage | Break Open the Highway |
09:00 10/11/2021 |
16:00 10/11/2021 |
AAPROVED | |
HWA-21-063 | Back Lane, Outside Anglesea House | Break Open the Highway |
09:00 08/11/2021 |
16:00 08/11/2021 |
AAPROVED | |
HWA-21-062 | Telegraph Road | Partial Road Closure |
08:00 28/11/2021 |
17:30 28/11/2021 |
APPROVED | |
HWA-21-061 | Hugh Town: Hugh Street, Silver Street, The Bank | Full Road Closure |
14:00 20/12/2021 |
21:00 20/12/2021 |
APPROVED | |
HWA-21-060 | Outisde Reculver, The Strand | Skip on the Highway |
09:00 13/10/2021 |
17:00 29/10/2021 |
APPROVED | |
HWA-21-059 | Rear of Wesleyan Chapel | Container on the Highway |
11:00 20/10/2021 |
18:00 20/10/2021 |
APPROVED | |
HWA-21-058 | Rear of Roadstead, Church Street | Breaking Open the Highway | 09:00 21/10/2021 | 16:00 21/10/2021 | APPROVED | |
HWA-21-057 | Outside 9 Little Porth | Breaking Open the Highway | 09:00 20/10/2021 | 16:00 20/10/2021 | APPROVED | |
HWA-21-056 | Jerusalem Terrace | Breaking Open the Highway |
09:00 28/09/2021 |
16:00 28/09/2021 |
APPROVED | |
HWA-21-055 | Ingram's Opening Between Park House and Parade Cottage | Partial Road Closure |
10:30 29/09/2021 |
15:00 29/09/2020 |
APPROVED | |
HWA-21-054 | Church Road, Outside The Bylet | Partial Road Closure |
09:00 23/09/2021 |
17:00 24/09/2021 |
APPROVED | |
HWA-21-053 | Church Road, Outside Men A Vaur | Container on the HIghway |
08:00 18/10/2021 |
17:00 15/03/2022 |
APPROVED | |
HWA-21-052 | Jerusalem Terrace, Outside The Mount | Breaking Open the Highway |
09:00 14/09/2021 |
16:00 14/09/2021 |
APPROVED | |
HWA-21-051 | 3 Porthcressa View | Breaking Open the Highway |
09:00 16/09/2021 |
16:00 16/09/2021 |
APPROVED | |
HWA-21-050 | Old Town Road, Junction to Old Town Lane | Breaking Open the Highway |
10:00 15/11/2021 |
17:00 17/11/2021 |
APPROVED | |
HWA-21-049 | Telegraph Road, Opposite Carn Thomas | Breaking Open the Highway |
09:00 20/08/2021 |
16:00 20/08/2021 |
APPROVED |
|
HWA-21-048 | Thorofare, Outside Golden Bay Flats | Breaking Open the Highway |
09:00 16/01/2022 |
16:00 16/01/2022 |
APPROVED | |
HWA-21-044 | Breaking Open the Highway |
0900 19/08/2021 (amended date) |
16:00 19/08/2021 (amended date) |
APPROVED | ||
HWA-21-047 | 'Mermaid Car Park' | Partial Closure and Breaking Open the Highway |
09:00 06/10/2021 |
16:00 07/10/2021 |
APPROVED | |
HWA-21-046 | 'Mermaid Car Park' | Emergency Partial Closure and Breaking Open the HIghway |
17:00 22/07/2021 |
22:00 22/07/2021 |
APPROVED | |
HWA-21-045 | Entrance to 'Mermaid Car Park' | Partial Closure and Breaing Open the Highway |
13:00 27/07/2021 |
16:00 27/07/2021 |
APPROVED | |
HWA-21-045 | Entrance to 'Mermaid Car Park' | Partial Closure and Breaing Open the Highway |
13:00 26/07/2021 |
16:00 26/07/2021 |
APPROVED | |
HWA-21-044 |
Back Lane, to the rear of the Methodist Church Hall
|
Breaking Open the Highway |
09:00 22/07/2021 |
16:00 22/07/2021 |
APPROVED | |
HWA-21-043 | Gleaner | Scaffolding on the Highway |
09:00 28/06/2021 |
09:00 04/09/2021 |
APPROVED | |
HWA-21-042 | Garrison Lane | Full Closure and Breaking Open of the Highway |
08:00 25/06/2021 |
16:00 28/06/2021 |
APPROVED | |
HWA-21-041 | Outisde Auriga, Porthcressa Road | Scaffolding on the Highway |
09:00 21/06/2021 |
16:00 14/07/2021 |
APPROVED | |
HWA-21-040 | The Bank to bottom of Garrison Hill | Partal Closure |
15:00 22/06/2021 |
17:00 25/06/2021 |
APPROVED | |
HWA-21-039 | Porthcressa pavement, outside the Schiller Shelter | Breaking Open and Partial Closure of the Pedestrian Highway |
12:00 25/05/2021 |
14:00 28/05/2021 |
APROVED | |
HWA-21-038 | Hugh Street, pavement outside the Post Office | Breaking Open the Pedestrian Highway |
10:00 14/05/2021 |
17:00 28/05/2021 |
APPROVED | |
HWA-21-037 | 8 Garrison Lane | Scaffolding on the HIghway |
09:00 28/05/2021 |
17:00 28/06/2021 |
APPROVED | |
HWA-21-036 | Pavement outside Baytree Cottage, Old Town | Breaking Open the Pedestrian Highways |
09:00 11/05/2021 |
17:00 12/05/2021 |
APPROVED | |
HWA-21-035 | Outside 2 Little Porth | Breaking Open the Highway |
09:00 10/05/2021 |
16:00 10/05/2021 |
APPROVED | |
HWA-21-034 | Outside the Library Building, Porthcressa & Outside Thorofare Cottage Thorofare | Breaking Open the Highway |
09:00 09/05/2021 |
16:00 09/05/2021 |
APPROVED | |
HWA-21-033 | Outside 2 Upper Strand & Outside Penora, Church Road | Breaking Open the Highway |
09:00 07/05/2021 |
16:00 07/05/2021 |
APPROVED | |
HWA-21-032 | Outside 2 Buzza Street & Outside Clarence House, Church Street | Breaking Open the Highway |
09:00 06/05/2021 |
16:00 06/05/2021 |
APPROVED | |
HWA-21-031 | The Parade, outside The Light House | Scaffolding on the Public Highway | 28/04/2021 | 05/05/2021 | APPROVED | |
HWA-21-030 | Parking Bay near Parade Flats | Container on the HIghway |
08:00 19/04/2021 |
18:00 20/04/2021 |
APROVED | |
HWA-21-029 | Closure of road leading from the Bank to the Mremaid car park | Full Road Closure |
09:00 31/03/2021 |
11:00 31/03/2021 |
APPROVED | |
HWA-21-028 | Outside Bank Chambers, Hugh Town | Scaffolding on Pedestrian Highway |
30/03/2021 09:00 |
05/04/2021 16:00 |
APPROVED | |
HWA-21-027 | Outside Santa Maria, Sally Port | Container on Highway |
07/04/2021 08:00 |
08/04/2021 18:00 |
APPROVED | |
HWA-21-026 | Outside Dolphins, Old Town | Container on Highway |
30/03/2021 08:00 |
03/04/2021 18:00 |
APPORVED | |
HWA-21-025 | 14 Silver Street | Container on the HIghway |
24/03/2021 08:00 |
25/03/2021 18:00 |
APPROVED | |
HWA-21-024 | Jerusalem Terrace, Bottom of Garrison Hill, Between Phone Box and Substation | Breaking Open the Highway |
15/03/2021 09:00 |
17/03/2021 17:00 |
APPROVED | |
HWA-21-023 | Silver Street, outside Silver Street Gallery and Foredeck | Scaffolding on the Highway |
15/03/2021 09:00 |
22/03/2021 16:00 |
APPROVED | |
HWA-21-022 | Rams Valley, to the rear of Lyndhurst |
Partial Highway Closure & Breaking Open the Highway |
22/03/2021 09:00 |
25/03/2021 17:00 |
APPROVED | |
HWA-21-021 | Thorofare to the Rear of Armorel |
Partial Highway Closure & Breaking Open the Highway |
05/03/2021 08:00 |
05/03/2021 16:00 |
APPROVED | |
HWA-21-020 | Church Road, Near Branksea Close | Container on the Highway |
02/03/2021 08:00 |
03/03/2021 18:00 |
APPROVED | |
HWA-21-019 | Breaking Open the Highway, to the Side of Hugh Street Cafe | Breaking Open the Highway |
11/03/2021 09:00 |
11/03/2021 16:00 |
APPROVED | |
HWA-21-018 |
Partial Highway Closure of The Thorofare to Allow Pedestrian Access Only Breaking Open Highway in the Following Locations Along The Thorofare: |
Partial Highway Closure & Breaking Open the Highway |
03/03/202 09:00 |
03/03/2021 16:00 |
APPROVED | |
HWA-21-017 | Breaking Open the Highway, outside Crebinick House, Church Street | Breaking Open the Highway |
02/03/2021 09:00 |
02/03/2021 16:00 |
APPROEVD | |
HWA-21-016 | Pedestrian Highway, outside the Wesleyan Chapel | Full Pedestrain Highway Closure |
05/05/2021 17:00 |
06/05/2021 23:00 |
APPROVED | |
HWA-21-015 | Pedestrian Highway outside 3 Porthcressa View | Full Pedestrain Highway Closure and Breaking Open the HIghway |
24/02/2021 08:00 |
26/02/2021 16:00 |
APPROVED | |
HWA-21-014 | Porthcressa, outside Sibleys Fuel and Marine Services | Breaking Open the Highway |
27/02/2021 09:00 |
27/02/2021 16:00 |
APPROVED | |
HWA-21-013 | Pedestrian Highway, outside The Atlantic Inn, Hugh Street | Breaking Open the Highway |
27/02/2021 09:00 |
27/02/2021 16:00 |
APPROVED | |
HWA-21-012 | Porthcressa, outside of the Library | Breaking Open the Highway |
27/02/2021 09:00 |
27/02/2021 16:00 |
APPROVED | |
HWA-21-011 | The Parade, outside Shearwater Guest House | Breaking Open the Highway |
26/02/2021 09:00 |
26/02/2021 16:00 |
APPROVED | |
HWA-21-010 | Back Lane, to the rear of Seaview Moorings | Breaking Open the Highway |
26/02/2021 09:00 |
26/02/2021 16:00 |
APPROVED | |
HWA-21-009 | The Thorofare, outside Schooners Hotel | Breaking Open the Highway |
03/03/2021 09:00 |
03/03/2021 16:00 |
APROVED | |
HWA-21-008 | Buzza Street, to the rear of No. 3 | Breaking Open the Highway |
26/02/2021 09:00 |
26/02/2021 16:00 |
APPROVED | |
HWA-21-007 | Pedestrian Highway outside 12 Silver Street | Breaking Open the Highway |
25/02/2021 09:00 |
25/02/2021 16:00 |
APPROVED | |
HWA-21-006 | Pedestrian Highway outside 1, 2 & 4 Porthcressa View | Breaking Open the Highway |
25/02/2021 09:00 |
25/02/2021 16:00 |
APPROVED | |
HWA-21-005 | Church Road, Outside Road Stead | Skip on Public Highway |
18/02/2021 08:00 |
20/02/2021 17:00 |
APPROVED | |
HWA-21-004 |
Sally Port, above No. 11 | Full Road Closure |
01/03/2021 08:00 |
12/03/2021 17:00 |
APPROVED | |
HWA-21-003-E | King Edwards Road | Partial Road Closure |
17/05/2021 09:00 |
21/05/2021 17:00 |
APPROVED | |
HWA-21-003-E | King Edwards Road |
Breaking Open the Highway |
17/05/2021 09:00 |
21/05/2021 17:00 |
APPROVED | |
HWA-21-003-D | Parsons Field |
Partial Road Closure and Breaking Open the Highway |
01/03/2021 09:00 |
05/03/2021 17:00 |
APPROVED | |
HWA-21-003-C | Full Road Closure and Breaking Open the Highway |
03/03/2021 09:00 |
05/03/2021 17:00 |
APPROVED | ||
HWA-21-003-B |
Full Road Closure and Breaking Open the Highway |
22/02/2021 09:00 |
02/03/2021 17:00 |
APPROVED | ||
HWA-21-003-A | Ennor Close | Partial Road Closure |
01/03/2021 09:00 |
05/03/2021 17:00 |
APPROVED | |
HWA-21-003-A |
Ennor Close |
Breaking Open the Highway |
09/02/2021 09:00 |
05/03/2021 17:00 |
APPROVED | |
HWA-21-002 | Public Highway outside Albany House, Church Road |
Full Pedestrian Highway Closure and Breaking Open Public Highway |
08/02/2021 09:00 |
12/02/2021 17:00 |
APPROVED | |
HWA-21-001 | Garrison Lane outside Charlotte House | Skip on Highway |
08/01/2021 09:00 |
15/01/2021 17:00 |
APPROVED |