Highway Closures & Other Highway Applications

Highway Closure Process

To apply for a road closure please see the Highway Closure Application Form to the right of this page. This form should be completed by anyone who would like to apply for permission to close the highway. You must allow at least 2 weeks if you are planning on a partial closure and 12 weeks if you are planning on a full road closure, (closure of the entire width of the road,) as a temporary traffic prohibition/restriction order will be required. Please return your completed form to environment@scilly.gov.uk or drop into the Library on St Marys. Please retain a copy for your records.

Please note the Council of the Isles of Scilly is not responsible for private roads. A highway closure form needs only to be filled when it affects a publicly maintained road. 

The list below reflects the current highway closure applications with the most recent and ‘live’ applications appearing at the top.

If you would like to comment or request more information on any of our applications please contact us at environment@scilly.gov.uk or give us a call on 01720 424450

Application Number

Location/ Road(s) Affected

Detail

Start Date and Time

Finish Date and Time

Decision

HWA-24-04 Footway behind Treboeth Guesthouse, Hugh Town, St Mary's Emergency Breaking Open the Highway

10:30

05/08/2024

15:00

05/08/2024

APPROVED
HWA-24-03 Mermaid Car Park, St Mary's Container on the Highway

20:00

 

13/08/2024

17:00

 

19/08/2024

APPROVED
HWA-24-01 Silver St car park, The Parade, Silver Street.   Full Road Closure, Partial Road Closure 8:00

31/05/2024
18:00

30/06/2026
APPROVED
HWA-23-015 (4) Carn Friars Lane, St Mary's Partial Road Closure

08:00

30/09/2023

19:00

30/09/2023

APPROVED
HWA-23-015 (3) Telegraph Road, Sunnyside to Rose Cottage Partial Road Closure

08:00

23/09/2023

19:00

23/09/2023

APPROVED
HWA-23-022 Outside Chemist, St Mary's Breaking Open the Highway

13:00

21/09/2023

17:00

22/09/2023

APPROVED
HWA-23-021 Well Lane, St Mary's Emergency Breaking Open the Highway and Full Road Closure

09:00

16/09/2023

16:00

18/09/2023

APPROVED
HWA-23-020 Park House Scaffolding on the Highway

09:00

15/09/2023

09:00

11/11/2023

APPROVED
HWA-23-015 (2) Parting Carn Junction to Longstone Corner Partial Road Closure

08:00

20/08/2023

20:00

20/08/2023

APPROVED
HWA-23-019 Back Lane Museum  Breaking Open the Highway

10:00

11/08/2023

11:00

11/08/2023

APPROVED
HWA-23-018 Old Town, opposite Old Town Inn car park Partial Road Closure

08:00

14/08/2023

17:00 

21/08/2023

APPROVED
HWA-23-015 (1) Telegraph to Rose Hill Junction Full Road Closure

08:00

06/08/2023

20:00

06/08/2023

APPROVED
HWA-23-014 17 Garrison Lane, Hugh Town Breaking Open the Highway

09:00

14/08/2023

17:00

18/08/2023

APPROVED
HWA-23-013 The Bank/Garrison Hill Breaking Open the Highway

08:00

09/07/2023

16:00

09/07/2023

APPROVED
HWA-23-011 15 The Strand, Hugh Town Container on the Highway

14:00

27/06/2023

17:00

30/06/2023

APPROVED
HWA-23-010 4 Well Cross, Hugh Town Container on the Highway

14:00

09/06/2023

17:00

30/06/2023

APPROVED
HWA-23-009 Well Lane, Hugh Town Breaking Open the Highway

09:00

24/05/2023

17:00

31/05/2023

APPROVED
HWA-23-008 An Oberva, Buzza Street Emergency Break in the Highway

08:00

20/05/2023

16:00

20/05/2023

APPROVED
HWA-23-007 Old Town Chapel Scaffolding on the Highway

09:00

18/05/2023

17:00

31/05/2023

APPROVED
HWA-23-006 Back Lane Alley way outside of Wesleyan Chapel Full Road Closure

12:00 

21/05/2023

22:00

22/05/2023

APPROVED
HWA-23-005 High Lanes, Sage House Breaking Open the Highway

15:00 

25/04/2023

16:00 

08/05/2023

APPROVED
HWA-23-004 Old Town Road, outside of Old Town Cafe Breaking Open the Highway

08:00 

24/04/2023

17:00

27/04/2023

APPROVED
HWA-23-003 Vine Cottage, St Mary's Container on the Highway

09:00

25/04/2023

17:00

02/05/2023

APPROVED
HWA-23-002 Seagull Cottage, Hugh Town, St. Mary's Container on the Highway

09:00

31/03/2023

09:00

04/04/2023

APPROVED
HWA-23-001 2 Buzza Street, Hugh Town, St. Mary's Container on the Highway

09:00

03/04/2023

17:00

03/04/2023

APPROVED
HWA-22-048 Old Town Chapel, Old Town, St. Mary's Scaffolding on the Highway

09:00

10/03/2023

17:00 

24/03/2023

APPROVED
HWA-22-047 Telegraph Road to Porthmellon Industrial Estate, St. Mary's Breaking Open the Highway

08:00

08/03/2023

17:00

11/03/2023

APPROVED
HWA-22-046 Rosevear, off Hugh Street, St. Mary's Breaking Open the Highway

08:00

07/03/2023

12:00

08/03/2023

APPROVED
HWA-22-045 Ennor Close, Old Town, St. Mary's Partial Road Closure

09:00

06/03/2023

17:00

17/03/2023

APPROVED
HWA-22-044 Tregarthen's Carpark, St. Mary's Container on the Highway

08:00

27/02/2023

17:00

03/03/2023

APPROVED
HWA-22-042 The Strand opposite Vine Cottage Road Closure & Breaking Open the Highway

09:00

06/03/2023

17:00

09/03/2023

APPROVED
HWA-22-041 Jerusalem Terrace Sub Station to Tregarthen's, St. Mary's Road Closure & Breaking Open the Highway

09:00 

09/03/2023

17:00

31/03/2023

APPROVED
HWA-22-040 Jerusalem Terrace, St. Mary's Road Closure & Breaking Open the Highway

09:00

13/03/2023

17:00

16/03/2023

APPROVED
HWA-22-039 Old Town Chapel Scaffolding on the Highway

09:00 

18/02/2023

17:00

23/02/2023

APPROVED
HWA-22-038 Tregarthen's Car Park, St. Mary's Container on the Highway

09:00

15/02/2023

17:00

15/02/2023

APPROVED
HWA-22-037 Lower Strand, St, Mary's Full Road Closure

11:00 

07/05/2023

19:00

07/05/2023

APPROVED
HWA-22-036 Porthloo Lane, St. Mary's, Isles of Scilly Breaking Open the Highway

08:00

04/02/2023

10:00

04/02/2023

APPROVED
HWA-22-035 The Strand, Back Lane, Hugh Town, St. Mary's Container on the Highway

08:00 

07/02/2023

17:00

30/03/2023

APPROVED
HWA-22-034 Carn Friars Lane, St. Mary's, Isles of Scilly Full Road Closure

08:00

08/02/2023

17:00

15/02/2023

APPROVED
HWA-22-033 Old Town Road, St. Mary's, Isles of Scilly Full Road Closure

08:00

05/02/2023

17:00

05/02/2023

APPROVED
HWA-22-032 The Junction of Carn Thomas and the Strand to the Park. The Junction of Well Cross and Church Road Full Road Closure 

12:00 

26/04/2023

12:00

02/05/2023

APPROVED
HWA-22-031 Tregarthen's Car Park Container on the Highway

8:00

12/01/2023

17:00

03/02/2023

APPROVED
HWA-22-030 Old Town Road Partial Road Closure

8:00

12/02/2023

17:00 

26/01/2023

APPROVED
HWA-22-029 Mermaid Car Park Breaking Open the Highway

12:30

06/12/2022

17:00

09/12/2022

APPROVED
HWA-22-028 Reculver, The Strand Container on the Highway

08:00

09/12/2022

18:00

10/12/2022

APPROVED
HWA-22-027 37 Porthcressa Road Breaking Open the Highway

9:00 

20/12/2022

17:00

24/12/2022

APPROVED
HWA-22-026 Church Street, outside Bell Rock Hotel Breaking Open the Highway

9:00 

19/12/2022

17:00

22/12/2022

APPROVED
HWA-22-025 Church Street, outside Mundesley Breaking Open the Highway

9:00 

19/12/2022

17:00

22/12/2022

APPROVED
HWA-22-024 Old Town Chapel Scaffolding on the Highway

9:00

28/11/2022

17:00

02/12/2022

APPROVED
HWA-22-023 The Strand, outside of No.4 Breaking Open the Highway

09:00

05/12/2022

17:00

08/12/2022

APPROVED
HWA-22-022 Church Road, outside of Godolphin Flats Container on the Highway

08:00

29/10/2022

18:00

03/11/2022

APPROVED
HWA-22-021 Hugh Street, The Parade, Garrison Lane, Silver Street and Jerusalem Terrace 

Full Closure of Hugh Street, Silver Street,  The Parade (between Bordeaux and The Galley), Garrison Lane (between The Papershop and The Wesleyan Chapel).

The suspension of one way traffic along Jerusalem Terrace

15:30 

21/12/2022

20:30

21/12/2022

APPROVED
HWA-22-020 Telegraph Road,at the Sandy Banks Field, behind Porthmellon Industrial Estate Partial Highway Closure

07:30

30/09/2022

17:00

14/10/2022

APPROVED
HWA-22-019 Church Road, opposite The Chaplaincy Container on the Highway 

08:00

21/09/2022

17:00

26/09/2022

APPROVED
HWA-22-018 Porthcressa Rd, outside of Penlee Boathouse Trailer and bags of aggregate on the highway

08:00

25/08/2022

17:00

02/09/2022

APPROVED
HWA/22/017 Public footpath outside The Old Chapel, Old Town Scaffolding on the Highway

09:00

29/08/2022

17:00

05/09/2022

APPROVED
HWA-22-016 Porthcressa Rd, outside of the Public Convenience

Breaking Open the Highway 

11:00

24/08/2022

17:00

31/08/2022

APPROVED
HWA-22-015 Sally Port Full Highway Closure

08:30

30/08/2022

16:00

07/09/2022

APPROVED
HWA-22-014 Jerusalem Terrace Full Closure and Breaking Open the Highway

13:00

18/08/2022

17:00

18/08/2022

APPROVED
HWA-22-013 Jerusalem Terrace Full Closure and Breaking Open the Highway

13:00

12/08/2022

17:00

12/08/2022

APPROVED 
HWA-22-012 Buzza Road, Porthcressa Partial Closure and Breaking Open the Highway

09:00

26/09/2022

16:00

30/09/2022

APPROVED
HWA-22-011 Carn Gwaval Hill Partial Closure of the Highway

08:00

16/08/2022

17:00

17/08/2022

APPROVED
HWA-22-010 Garrison Lane, outside the Wesleyan Chapel Ladder on the Highway

10:30

27/07/2022

15:00

27/07/2022

APPROVED
HWA-22-009 Church Road, outside Mundesley Breaking Open the Highway 

08:00

08/08/2022

17:00

13/08/2022

APPROVED
HWA-22-008 Porthcressa Road Partial Closure and Breaking Open the Highway

09:00

11/08/2022

16:00

25/08/2022

APPROVED
HWA-22-007 Outside old Lloyds Bank buildig, Hugh Street 

Container on Public Highway

09:00

06/09/2022

17:00

17/09/2022

APPROVED
HWA-22-006 Rear of Town Hall, Silver Street Scaffolding on Highway

10:00

01/07/2022

17:00

03/07/2022

APPROVED
HWA-22-005 31-32 Porthcressa Road Scaffolding on the Highway

09:00

04/07/2022

09:00

01/08/2022

APPROVED
HWA-22-004 Back Lane Container on the Highway

09:00

17/05/2022

16:00

17/05/2022

APPROVED
HWA-22-003 Footpath to The Store, Porthmellon Industrial Estate Partial Closure and Breaking Open the Public HIghway

09:00

30/05/2022

17:00

01/06/2022

APPROVED
HWA-22-002 Hugh Street, The Parade, The Strand Rolling/Moving Highway Closure

12:30

12/06/2022

14:30

12/06/2022

APPROVED
HWA-22-001 1 Ennor Close Scaffolding on Highway

09:00

14/04/2022

16:00

14/04/2022

APPROVED
HWA-21-098C Lower Stand to Telegraph Road Full Highway Closure

08:55

05/06/2022

09:05

05/06/2022

APPROVED
HWA-21-098B The Strand and Telegraph Road Full Highway Closure

10:50

04/06/2022

11:10

04/06/2022

APPROVED
HWA-21-098A The Strand Full Highway Closure

08:00

03/06/2022

12:00

06/06/2022

APPROVED
HWA-21-97 Upper Church Street outside Rosemerryn Breaking Open the Highway

09:00

22/03/2022

16:00

22/03/2022

APPROVED
HWA-21-096 Holy Vale Partial Road Closure

08:00

16/03/2022

17:00

23/03/2022

APPROVED
HWA-21-095 Rams Valley Breaking Open the Highway

09:00

17/03/2022

16:00

17/03/2022

APPROVED
HWA-21-094 Thorofare, outside Golden Bay Mansions Breaking Open the Highway

09:00

19/03/2022

16:00

19/03/2022

APPROVED
HWA-21-093 The Strand, outside Vine Cottage Scaffolding on the Highway

09:00

03/03/2022

17:00

10/03/2022

APPROVED
HWA-21-092 The Strand Breaking Open the Highway

08:00

03/03/2022

17:00

12/03/2022

APPROVED
HWA-21-91 The Bank, outside The Mermaid Inn Scaffolding on the Highway

08:00

04/03/2022

16:00

04/03/2022

APPROVED
HWA-21-090 6 Silver Street Scaffolding on the Highway

09:00

14/03/2022

16:00

16/03/2022

APPROVED 
HWA-21-089 OldTown Road - Nowhere to Old Town Cafe Full Highway Closure

16:00

17/02/2022

08:00

18/02/2022

APPROVED
HWA-21-088 The Strand and Well Cross Full HIghway Closure

12:00

27/04/2022

12:00

02/05/2022

APPROVED
HWA-21-087 Rear of Town Hall, St Marys

Scaffolding on Highway

(Emergency)

09:00

01/02/2022

17:00

04/02/2022

APPROVED
HWA-21-086 Church Street, outside of Museum building, opposite Westford House Skip on the highway

16:00

26/01/2022

17:00

27/01/2022

APPROVED
HWA-21-085 Old Town Lane, outside The Old Chapel Scaffolding on the HIghway

08:30

17/01/2022

17:00

18/01/2022

APPROVED
HWA-21-084 The Bank, outside R Douglas Chemist Emergency Partial Closure and Breaking Open the Highway

15:00

11/01/2022

18:00

11/01/2022

APPROVED
HWA-21-083

Church Road,

outside Bell Rock Hotel

Partial Closure and Breaking Open the Highway

08:00

14/02/2022

17:00

16/02/2022

APPROVED
HWA-21-082

Rams Valley,

rear of Bell Rock Hotel

Partial Closure and Breaking Open the Highway

08:00

05/02/2022

17:00

12/02/2022

APPROVED
HWA-21-081 Branksea Close Partial Closure and Breaking Open the Highway

08:00

24/01/2022

17:00

28/01/2022

APPROVED 
HWA-21-080 The Bank, outside Calico Jacks Skip on the Highway

08:00

07/01/2022

17:00

07/01/2022

APPROVED 
HWA-21-079 'Mermaid Car Park' Closure of three parking spaces

08:00

05/01/2022

17:00

04/02/2022

APPROVED
HWA-21-078 McFarlands Down Junction  Works to HIghway Surface (no closure in place)

08:00

21/12/2021

17:00

23/12/2021

APPROVED
HWA-21-077 Outisde Rattler, Thorofare Breaking Open the Highway

09:00

17/01/2022

16:00

17/01/2022

APPROVED
HWA-21-076 Outside Nerina, Upper Church Street Breaking Open the Highway

09:00

23/02/2022

16:00

23/02/2022

APPROVED
HWA-21-075 Church Street, Hugh Street, Lower Strand Moving Full Road Closure

18:25

27/02/2022

19:30

27/02/2022

APPROVED
HWA-21-074 Area between Museum Flats and rear of Reculver, The Strand Skip on the Highway

09:00

14/12/2021

17:00

25/01/2022

APPROVED
HWA-21-073 Hugh Street, outside of The Atlantic Inn Scaffolding on the HIghway 

10:00

30/11/2021

TBC APPROVED  
HWA-21-072 Porthloo Break Open and Partial Closure of the Highway

09:00

12/11/2021

16:00

12/11/2021

APPROVED
HWA-21-071 Porthcressa Rd, Outside Lynwood Break Open the Highway

09:00

15/11/2021

16:00

15/11/2021

APPROVED
HWA-21-070 Church Rd, Outsde The Elms Break Open the Highway

09:00

14/11/2021

16:00

14/11/2021

APPROVED
HWA-21-069 Upper Church Street, Outside Nerina Break Open the Highway

09:00

14/11/2021

16:00

14/11/2021

APPROVED
HWA-21-068 Upper Church Street, Outside The Bylet Break Open the Highway

09:00

14/11/2021

16:00

14/11/2021

APPROVED
HWA-21-067 Bay View Terrace Break Open the Highway

09:00

13/11/2021

16:00

13/11/2021

APPROVED
HWA-21-066 Back Lane, Outside Bosuns Locker Break Open the Highway

09:00

11/11/2021

16:00

11/11/2021

APPROVED
HWA-21-065 Thorofare, Outside The Metal Store Break Open the Highway

09:00

11/11/2021

16:00

11/11/2021

APPROVED
HWA-21-064 Little Porth, Outside Storm Cottage Break Open the Highway

09:00

10/11/2021

16:00

10/11/2021

AAPROVED
HWA-21-063 Back Lane, Outside Anglesea House Break Open the Highway

09:00

08/11/2021

16:00

08/11/2021

AAPROVED
HWA-21-062 Telegraph Road Partial Road Closure

08:00

28/11/2021

17:30 

28/11/2021

APPROVED
HWA-21-061 Hugh Town: Hugh Street, Silver Street, The Bank  Full Road Closure

14:00

20/12/2021

21:00

20/12/2021

APPROVED
HWA-21-060  Outisde Reculver, The Strand Skip on the Highway

09:00

13/10/2021

17:00

29/10/2021

APPROVED
HWA-21-059 Rear of Wesleyan Chapel Container on the Highway

11:00

20/10/2021

18:00

20/10/2021

APPROVED
HWA-21-058 Rear of Roadstead, Church Street Breaking Open the Highway 09:00 21/10/2021 16:00 21/10/2021 APPROVED
HWA-21-057 Outside 9 Little Porth  Breaking Open the Highway 09:00 20/10/2021 16:00 20/10/2021 APPROVED
HWA-21-056 Jerusalem Terrace Breaking Open the Highway

09:00

28/09/2021

16:00

28/09/2021

APPROVED
HWA-21-055 Ingram's Opening Between Park House and Parade Cottage Partial Road Closure 

10:30

29/09/2021

15:00

29/09/2020

APPROVED 
HWA-21-054 Church Road, Outside The Bylet Partial Road Closure 

09:00

23/09/2021

17:00

24/09/2021

APPROVED 
HWA-21-053 Church Road, Outside Men A Vaur  Container on the HIghway 

08:00

18/10/2021

17:00

15/03/2022

APPROVED 
HWA-21-052 Jerusalem Terrace, Outside The Mount  Breaking Open the Highway

09:00

14/09/2021

16:00

14/09/2021

APPROVED 
HWA-21-051 3 Porthcressa View  Breaking Open the Highway

09:00

16/09/2021

16:00

16/09/2021

APPROVED
HWA-21-050 Old Town Road, Junction to Old Town Lane Breaking Open the Highway

10:00

15/11/2021

17:00

17/11/2021

APPROVED
HWA-21-049 Telegraph Road, Opposite Carn Thomas Breaking Open the Highway

09:00

20/08/2021

16:00

20/08/2021

APPROVED

HWA-21-048 Thorofare, Outside Golden Bay Flats  Breaking Open the Highway

09:00

16/01/2022

16:00

16/01/2022

APPROVED
HWA-21-044

Outside 3 Porthcressa Road

Outside Tater Du, Church Road

Breaking Open the Highway

0900

19/08/2021

(amended date)

16:00

19/08/2021

(amended date)

APPROVED 
HWA-21-047 'Mermaid Car Park' Partial Closure and Breaking Open the Highway 

09:00

06/10/2021

16:00

07/10/2021

APPROVED
HWA-21-046 'Mermaid Car Park' Emergency Partial Closure and Breaking Open the HIghway 

17:00

22/07/2021

22:00

22/07/2021

APPROVED
HWA-21-045 Entrance to 'Mermaid Car Park' Partial Closure and Breaing Open the Highway

13:00

27/07/2021

16:00

27/07/2021

APPROVED
HWA-21-045 Entrance to 'Mermaid Car Park' Partial Closure and Breaing Open the Highway  

13:00

26/07/2021

16:00

26/07/2021

APPROVED 
HWA-21-044

Outside Tater Du, Church Road

 

Back Lane, to the rear of the Methodist Church Hall

 

Outside 3 Porthcressa Road

Breaking Open the Highway

09:00

22/07/2021

16:00

22/07/2021

APPROVED
HWA-21-043 Gleaner Scaffolding on the Highway 

09:00

28/06/2021

09:00

04/09/2021

APPROVED
HWA-21-042 Garrison Lane Full Closure and Breaking Open of the Highway

08:00 

25/06/2021

16:00

28/06/2021

APPROVED
HWA-21-041 Outisde Auriga, Porthcressa Road Scaffolding on the Highway

09:00

21/06/2021

16:00

14/07/2021

APPROVED
HWA-21-040 The Bank to bottom of Garrison Hill Partal Closure 

15:00 

22/06/2021

17:00

25/06/2021

APPROVED 
HWA-21-039 Porthcressa pavement, outside the Schiller Shelter Breaking Open and Partial Closure of the Pedestrian Highway

12:00

25/05/2021

14:00

28/05/2021

APROVED
HWA-21-038 Hugh Street, pavement outside the Post Office Breaking Open the Pedestrian Highway 

10:00

14/05/2021

17:00

28/05/2021

APPROVED 
HWA-21-037 8 Garrison Lane Scaffolding on the HIghway 

09:00

28/05/2021

17:00

28/06/2021

APPROVED 
HWA-21-036 Pavement outside Baytree Cottage, Old Town  Breaking Open the Pedestrian Highways 

09:00

11/05/2021

17:00

12/05/2021

APPROVED 
HWA-21-035 Outside 2 Little Porth Breaking Open the Highway

09:00

10/05/2021

16:00

10/05/2021

APPROVED
HWA-21-034 Outside the Library Building, Porthcressa & Outside Thorofare Cottage Thorofare Breaking Open the Highway

09:00

09/05/2021

16:00

09/05/2021

APPROVED
HWA-21-033 Outside 2 Upper Strand & Outside Penora, Church Road Breaking Open the Highway

09:00

07/05/2021

16:00

07/05/2021

APPROVED
HWA-21-032 Outside 2 Buzza Street & Outside Clarence House, Church Street  Breaking Open the Highway

09:00

06/05/2021

16:00

06/05/2021

APPROVED
HWA-21-031 The Parade, outside The Light House  Scaffolding on the Public Highway 28/04/2021 05/05/2021 APPROVED 
HWA-21-030 Parking Bay near Parade Flats  Container on the HIghway

08:00

19/04/2021

18:00

20/04/2021 

APROVED 
HWA-21-029 Closure of road leading from the Bank to the Mremaid car park Full Road Closure

09:00

31/03/2021

11:00

31/03/2021

APPROVED 
HWA-21-028 Outside Bank Chambers, Hugh Town  Scaffolding on Pedestrian Highway 

30/03/2021

09:00

05/04/2021

16:00

APPROVED 
HWA-21-027 Outside Santa Maria, Sally Port  Container on Highway

07/04/2021

08:00

08/04/2021

18:00

APPROVED 
HWA-21-026 Outside Dolphins, Old Town Container on Highway

30/03/2021

08:00

03/04/2021

18:00

APPORVED 
HWA-21-025 14 Silver Street Container on the HIghway 

24/03/2021

08:00

25/03/2021

18:00

APPROVED 
HWA-21-024 Jerusalem Terrace, Bottom of Garrison Hill, Between Phone Box and Substation Breaking Open the Highway 

15/03/2021

09:00

17/03/2021

17:00

APPROVED 
HWA-21-023 Silver Street, outside Silver Street Gallery and Foredeck Scaffolding on the Highway 

15/03/2021

09:00

22/03/2021

16:00

APPROVED 
HWA-21-022 Rams Valley, to the rear of Lyndhurst 

Partial Highway Closure 

&

Breaking Open the Highway 

22/03/2021

09:00

25/03/2021

17:00

APPROVED 
HWA-21-021 Thorofare to the Rear of Armorel 

Partial Highway Closure 

&

Breaking Open the Highway 

05/03/2021

08:00

05/03/2021

16:00

APPROVED 
HWA-21-020 Church Road, Near Branksea Close  Container on the Highway 

02/03/2021

08:00

03/03/2021

18:00

APPROVED 
HWA-21-019 Breaking Open the Highway, to the Side of Hugh Street Cafe  Breaking Open the Highway

11/03/2021

09:00

11/03/2021

16:00

APPROVED
HWA-21-018

Partial Highway Closure of The Thorofare to Allow Pedestrian Access Only 

Breaking Open Highway in the Following Locations Along The Thorofare:

Outside the Canvas Shop

Outside Evergreen Cottage

Outside Harbour Lights

Outside The Boathouse

Outside Maritime House

Partial Highway Closure 

&

Breaking Open the Highway 

03/03/202

09:00

03/03/2021

16:00

APPROVED 
HWA-21-017 Breaking Open the Highway, outside Crebinick House, Church Street  Breaking Open the Highway

02/03/2021

09:00

02/03/2021

16:00

APPROEVD
HWA-21-016 Pedestrian Highway, outside the Wesleyan Chapel  Full Pedestrain Highway Closure 

05/05/2021

17:00

06/05/2021

23:00

APPROVED 
HWA-21-015 Pedestrian Highway outside 3 Porthcressa View Full Pedestrain Highway Closure and Breaking Open the HIghway

24/02/2021

08:00

26/02/2021

16:00

APPROVED
HWA-21-014 Porthcressa, outside Sibleys Fuel and Marine Services Breaking Open the Highway

27/02/2021

09:00

27/02/2021

16:00

APPROVED
HWA-21-013 Pedestrian Highway, outside The Atlantic Inn, Hugh Street Breaking Open the Highway

27/02/2021

09:00

27/02/2021

16:00

APPROVED
HWA-21-012 Porthcressa, outside of the Library Breaking Open the Highway

27/02/2021

09:00

27/02/2021

16:00

APPROVED
HWA-21-011 The Parade, outside Shearwater Guest House Breaking Open the Highway

26/02/2021

09:00

26/02/2021

16:00

APPROVED 
HWA-21-010 Back Lane, to the rear of Seaview Moorings  Breaking Open the Highway

26/02/2021

09:00

26/02/2021

16:00

APPROVED
HWA-21-009 The Thorofare, outside Schooners Hotel Breaking Open the Highway

03/03/2021

09:00

03/03/2021

16:00

APROVED 
HWA-21-008 Buzza Street, to the rear of No. 3 Breaking Open the Highway

26/02/2021

09:00

26/02/2021

16:00

APPROVED 
HWA-21-007 Pedestrian Highway outside 12 Silver Street Breaking Open the Highway

25/02/2021

09:00

25/02/2021

16:00

APPROVED 
HWA-21-006 Pedestrian Highway outside 1, 2 & 4 Porthcressa View Breaking Open the Highway

25/02/2021

09:00

25/02/2021

16:00

APPROVED 
HWA-21-005 Church Road, Outside Road Stead Skip on Public Highway

18/02/2021

08:00

20/02/2021

17:00

APPROVED

HWA-21-004

Sally Port, above No. 11 Full Road Closure

01/03/2021

08:00

12/03/2021

17:00

APPROVED 
HWA-21-003-E King Edwards Road Partial Road Closure

17/05/2021

09:00

21/05/2021

17:00

APPROVED 
HWA-21-003-E King Edwards Road

Breaking Open the Highway

17/05/2021

09:00

21/05/2021

17:00

APPROVED 
HWA-21-003-D Parsons Field

Partial Road Closure and Breaking Open the Highway

01/03/2021

09:00

05/03/2021

17:00

APPROVED 
HWA-21-003-C

Jerusalem Terrace

Full Road Closure and Breaking Open the Highway

03/03/2021

09:00

05/03/2021

17:00

APPROVED 

HWA-21-003-B

Mermaid Car Park and The Bank

Full Road Closure and Breaking Open the Highway

22/02/2021

09:00

02/03/2021

17:00

APPROVED 
HWA-21-003-A Ennor Close  Partial Road Closure

01/03/2021

09:00

05/03/2021

17:00

APPROVED 

HWA-21-003-A

Ennor Close

Breaking Open the Highway

09/02/2021

09:00

05/03/2021

17:00

APPROVED 
HWA-21-002 Public Highway outside Albany House, Church Road

Full Pedestrian Highway Closure and Breaking Open Public Highway

08/02/2021

09:00

12/02/2021

17:00

APPROVED 
HWA-21-001 Garrison Lane outside Charlotte House Skip on Highway

08/01/2021

09:00

15/01/2021

17:00

APPROVED